You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan jalan dan turap ambles Kali Sunter Agung

Personnel Repair Collapsed Retaining Wall and Road in Sunter C River

The North Jakarta Water Resources Sub-agency (SDA) repairs the collapsed retaining wall and road at Sunter C River, Jalan Danau Sunter Utara, Sunter Agung Urban Village, Tanjung Priok Sub-district.

We fix it permanently

This quick action was taken to prevent further damage and ensure the safety of residents.

North Jakarta SDA Sub-agency Head, Heria Suwandi said, the retaining wall collapsed due to factors such as age, tree roots, and high rainfall intensity over the past few months. These conditions caused the embankment and roadbed to gradually tilt and erode.

5,355 Malfunctioned Street Lights in North Jakarta Repaired

"The same incident happened in mid-November and has been fixed. And now we fix it permanently," he expressed, Wednesday (12/3).

He explained, the collapsed section of the retaining wall and road has 1.5 meters wide and temporarily disrupted the activities of passing drivers at the location.

"We deployed 12 personnel to fix it. We also deployed one excavator for dredging," he explained.

He added everything went smoothly, but personnel must work extra carefully because of the electrical cables on the edge of the retaining wall.

"It will finish in early January 2026. We also plan to do another repair on the west side," he added.

The work received appreciation from Sunter Agung Urban Village Head, Teguh Subroto.

"When the road and retaining wall collapsed, we immediately reported it and it was promptly addressed. Hopefully, the repairs can be done gradually because many parts are already tilted," he explained.

Meanwhile, one of the private employees working around the area also appreciates the personnel’s efforts in making repairs. Hopefully, this could be completed soon for the comfort of everyone.

"Hope it can be finished quickly because the rainy season has started," he stated.

Linked News
Popular News indeks
  1. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye585 personAldi Geri Lumban Tobing
  2. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye548 personFakhrizal Fakhri
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye537 personDessy Suciati
  4. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye520 personAldi Geri Lumban Tobing
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye515 personAnita Karyati